TODAY -

Will Tipaimukh Hydro Electric Project really kick off? Will there be light ?
FAC reiterates stand against forest land diversion
Source: The Sangai Express / Ninglun Hanghal

New Delhi, September 09 2013: In another round of the Forest Advisory Committee in the Ministry of Environment and Forest meeting on August 13 and 14, over diversion of 1551.60 hectares of forest land in Mizoram for the construction of Tipaimukh Multipurpose Dam, the committee once again reiterated that diversion of forest land should not be sanctioned.

It recalled its earlier meeting in July, where the FAC had disapproved the diversion of 25,822 hectares of Forest land in Manipur.

The committee had stated that the forest area that has 7816931 trees and 0.27 lakh bamboos, is largely disproportionate to the expected power generation, and that the overall cost far outweigh the benefits likely to be acquired.

The said requirement is 1/5th of the total land requirements for an odd 497 such hydro project in the whole country.



Barak rivewr over which Tipaimukh Dam is proposed to come up
Barak rivewr over which Tipaimukh Dam is proposed to come up


Besides the delay, clouded in controversy and secrecy, the proposed project has also caused a stir in the political establishments and civil society in neighboring Bangladesh , given that water flows down from the confluence in Tipaimukh to Surma and Khushiara rivers and construction of the reservoir at this junction will affect the seasonal flow in the downstream.

The apprehension, concerns and reactions from Bangladesh can be summed up from an opinion written by Bangladesh Prime Minister's Foreign Advisor Gowher Rizvi in December 2011, ( Daily Star, Dhaka ).

Maintaining that the project will adversely impact the environment, economy and security of Bangladesh, Rizvi stated that Bangladesh cannot afford to take it lightly and must gear up to ensure that their National interests are not compromised.

The project which is proposed to be funded through World Bank have so far not been arranged nor even discussed with the Bank, the Bangladesh PM Foreign adviser wrote.

Rizvi underlined that Barak is an international river and therefore the interests of Bangladesh has to be taken into account according to current international practices.

Asserting that India had assured Bangladesh it would not take any action over Tipaimukh HEP that would hurt the interests of Bangladesh Rizvi stated that civil society and scientists in Bangladesh should conduct an in-depth study to come up to an independent conclusion.

Estimated at Rs 5,885.00 crore the 162.80 metre reservoir proposed to be built 500 metres downstream at the confluence of the river Tuivai from Mizoram and river Barak from Assam was conceptualized to control flood in Assam valley and generate 1500 MW for power starved Manipur and North Eastern States of India at large.

The concept began to materialize after the first meeting between India and Bangladesh Joint Rivers Commission held in New Delhi in 1972.Subsequently, the project site was identified in 1974.An agreement was signed between the Government of Manipur, National Hydro Power Corporation ( NHPC) Ltd.

and Sutlej Jal Vidyut Nigam Ltd (SJVN) in October 2011.NHPC replaced NEEPCO- North Eastern Electric Power Corporation Ltd in 2009 for reasons unknown.

Manipur Government in November 2006 wrote to the MoEF for necessary action for Forest clearance, forwarding an Ariel survey report of the proposed project site by Regional Forest Department, State Forest Department and comments from User agency NEEPCO.

All these departments had given their no objection statement for the Construction of the hydro project, including the State Pollution Control Board.

The joint survey observed that large part of the catchment area is subjected to shifting cultivation (a practice by inhabitants of the hills in Manipur) and that the project area does not harbor significant wildlife, nor is a national park or wildlife sanctuary, neither a bio-sphere or a tiger reserve and not an elephant corridor.

The survey report also maintained that the surveyed site does not come under a protected area and that there is no official document to support its socio-cultural, religious value associated with this forest land.

The project went into a roadblock at the Ministry's Environment Clearance meeting several times.

In its meeting in 2007 and 2008 the expert appraisal committee had commented that the State Government merely forwarded reports and comments of Departmental surveys / reports, which the committee stated cannot be accepted as an approval.

Further, examining the EIA ( environment assessment report) the expert committee found that there is no mention of the location of the sampling survey neither a schedule of public hearing.

It also noted its surprise that inhabitants have left the proposed site to pave the way for the project.

The committee stated that the water quality study done by the state pollution control board, which is based on 1990 data did not follow the direction of the committee.

Moreover the EIA report did not mention the flora and fauna; its type and number etc inhabiting the proposed site, but reported that no 'economically' viable fauna were found in the project site, that has raised doubts of the committee.

The experts also seeks clarification on the question of 'indigenous' upon the mention of 172 species of fish and out of this 23 fish species were categorically stated as indigenous, it asked whether the remaining species are exogenous.

It also seeks for a Seismic study of the area.

The committee noted that the amount of rainfall during the period of 10 years in the study is unbelievably meager for construction of such a large hydro project.

As it stands today, it is merely a halt on diversion of required Forest land and not a stop to the implementation of the Tipaimukh hydro project.

The FAC had suggested for revision of the project where forest land requirement can be minimized and therefore lesser socio � environment impact.

Now the anxiety is whether FAC's comments, observations will be considered or respected.

The vague survey and environment assessment of the project remains a concern for obvious reasons.

Going by the reports it is clear that no research study and data were available on the flora and fauna of the Hills of Manipur.

And that the odd 2000 or so "tribal" forest inhabitants who will be displaced were merely considered an insignificant occupants of the forest and that their livelihood such as agricultural practice - Jhum Cultivation were considered an unimportant activity and destructive.

Moreover, the unclassified forest with no record of "important, notable wildlife, sanctuaries etc" further supports the theory of 'insignificance' of this forest land.

Voices of concerns over big dams and the search for alternative solutions with lesser impact were raised from several quarters.

While no major success and output of hydro projects and large dams are witnessed in the northeastern region, particularly in Manipur, will the Tipaimukh Hydro Power bring light in the dark corner of India's border is something that is not so convincing.


* Comments posted by users in this discussion thread and other parts of this site are opinions of the individuals posting them (whose user ID is displayed alongside) and not the views of e-pao.net. We strongly recommend that users exercise responsibility, sensitivity and caution over language while writing your opinions which will be seen and read by other users. Please read a complete Guideline on using comments on this website.




LATEST IN E-PAO.NET
  • Sajibu Cheiraoba: 1 occasion, 2 narratives #2
  • Violence in Manipur 2023-2024 : Timeline
  • Election Duty :: Travellog
  • 1st Nagas' Meet in Punjab
  • How to select right MP to represent Manipur
  • "ST status for Meetei" at Tejpur
  • Bats are Keystone species for the Planet
  • The '15 days' conundrum
  • Free but not so fair
  • Descent of Radha-Krishna #30: Download
  • Before You Vote : My Rumbling Thoughts
  • "ST status for Meetei" at Kakching
  • Meiraba wins All India Sr tournament
  • Finding light in dark through my daughter
  • Navigating life's unreasonable expectations
  • Test of people's character
  • BJP's election manifesto
  • Athoubasingi Numit #1 : Gallery
  • Black rice & Glycemic Index
  • What Nadda should speak at Dimapur rally
  • Open Letter to CM Office Manipur
  • Meghalaya unveils Strawberry festival
  • Benefits of maths newspapers for students
  • Id-ul-Fitr @Hatta #1 : Gallery
  • Are you a good person ?
  • Physics Academy of NE : Executive Body
  • "ST status for Meetei" at Moirang
  • Cherrapunji Eastern Craft Gin launched
  • Cong on cautious path
  • Botox for Hair
  • Posers voters should raise now
  • The lull before the storm
  • 80th Anniv- Battle of Kanglatongbi @UK
  • Vir Chakra Ngangom Joydutta's bust unveiled
  • Hun - Thadou Cultural Festival : Gallery
  • "ST status for Meetei" at Singjamei
  • Election Eclipses: Ballad of Battle & Loss
  • Our voices are equal at the ballot box
  • Scientists of Manipur : Ngangkham Nimai
  • Urgent Call for Solidarity in Manipur
  • Meitei Nongsha #2 :: An Artwork
  • "ST status for Meetei" at Waikhong
  • About NPF-BJP-NPP alliance & why ?
  • World Veterinary Day, 2024
  • The heavy stake behind the LS polls
  • The politics of lying & deception
  • Sajibu Cheiraoba Chak Katpa #1 : Gallery
  • Hun-Thadou Cultural Fest @ Delhi: Report
  • Appeal to Parties & Candidates
  • "ST status for Meetei" at Wangoo
  • Establishment of community seed bank
  • Awareness Programme on new Criminal Laws
  • Make a right choice at the Lok Sabha election
  • Sajibu Cheiraoba: 1 occasion, 2 narratives #1
  • RIST talk-58 : Support systems of elderly
  • "ST status for Meetei" at Hiyanglam
  • Vote, do not boycott !
  • Lok Sabha election: A new dawn in politics ?
  • IIT-Guwahati Half Marathon report
  • Taking ST demand to the election ring
  • Lesson to be learnt from across border
  • Mirabai: Poised for Paris Olympics
  • Legal position for protection of environment
  • "ST status for Meetei" at Keisamthong
  • Heterocyclic compound & biochemical science
  • Inner, torn between two lovers
  • Certification Music Therapy Workshop
  • NOTA as a choice
  • Caesar's wife must be above suspicion
  • Descent of Radha-Krishna #29: Download
  • World Health Day 2024
  • "ST status for Meetei" at Pangantabi
  • The Power of Poppy - 26 :: Poem
  • Fulbright Fellowship Outreach at Arunachal
  • Id-ul Fitr da namaz nattana..
  • Nupi Landa Thaunaphabishing #13 :: Book
  • Lok Sabha election is coming, be prepared
  • 6th Hun-Thadou Cultural Festival
  • Let There Be Free & Fair Election
  • "ST status for Meetei" at Lamlong
  • Science magazines are important for student
  • Interesting choice of candidates
  • The power of We, the voters
  • Inspirations from Scientists of Manipur #1
  • The Case for Amendment of Article 371-C
  • Meitei Nongsha #1 :: Artwork
  • Link between forest & conflict in Manipur
  • Final Call for Application MFA - Phase-2
  • ST for Meiteis call before elections
  • Passing the buck
  • Beating of the Retreat #1 : Gallery
  • Life of our Lives in Ethnic Strife Era! :: Poem
  • IIT-Guwahati annual Half Marathon
  • Follow up: European Parliament on Manipur
  • Yoga & Kegel exercise: Pelvic floor workout
  • Opting for the NOTA button
  • Yearning of the displaced people
  • Kenedy Khuman (Singer) : Gallery
  • 5th NE Women's Peace Congregation
  • World Autism Awareness Day 2024
  • Election fever grips Manipur despite unrest
  • Looking for a decent election hustings
  • Clock ticking towards voting day
  • An exemplary directive
  • Children Camp @JNMDA Imphal #1 : Gallery
  • Memo to Election Commission of India
  • Easter & Holi echo in Nilgiris
  • Holiday Camp for children at JNMDA, Imphal
  • Zero waste is our moral responsibility
  • Elections & loyalty vis-a-vis Manipur crisis
  • Show of strength without unity
  • Yaoshang Pichakari #2 : Gallery
  • Panthoi Chanu : 1st to play in Australia
  • Intensive labs in film preservation
  • Building bridges with books
  • Need of the hour: Political maturity
  • Accepting defeat before the election
  • Descent of Radha-Krishna #28: Download
  • April Calendar for Year 2024 : Tools
  • Natural packaging from bamboo : Gallery
  • The Power of Poppy - 25 :: Poem
  • Everyone has their own Bharat Ratna
  • Nupi Landa Thaunaphabishing #12 :: Book
  • Demand- Manipuri as classical language
  • The Drummer from Odisha
  • Beauty benefits of lemon
  • Yaoshang Mei Thaba #2 : Gallery
  • Manipur's original Ponies : Gallery
  • Yaoshang & Dance of Democracy loom
  • Symposium on Jagadguru Shankaracharya
  • Choosing ITI as a campus after X
  • Yaoshang Pichakari #1 : Gallery
  • Yaoshang @Nabadwip Dham : Gallery
  • How oral health affects your pregnancy
  • Two faces of Holi
  • Prawaas 4.0, Multimodal Transport Show
  • A decade of development of higher education
  • Yaoshang Mei Thaba #1 : Gallery
  • Our Eternal Kangleipak :: Poem
  • Micro-livestock for livelihoods: For NE States
  • The fun of Holi used to be monotonous
  • 2nd Annual Art Exhibition #1 : Gallery
  • About the "Meitei" community from Manipur
  • Unveiling the medicinal benefits of honey
  • The incalculable value of wildlife
  • Promises of true love
  • Trends, Alliances, & Challenges in Elections
  • Meitei Goddess Ngaleima : An Artwork
  • Water is the most precious gift of God
  • Bharat needs a strong 'India'
  • Transformation of railway stations
  • Not quite the final countdown
  • Missing of 'The Saffron' from electoral colour
  • Descent of Radha-Krishna #27: Download
  • 3rd North East Games: Manipur champion
  • The Power of Poppy - 24 :: Poem
  • EBTC & JCRE signed MoU
  • Early Detection Program at Toubul
  • How Holi affects our mood & mental health
  • Lamta Thangja @ Imphal : Gallery
  • Manipur cinema legacy shines at ARCUREA
  • The pulse of politics amidst conflict
  • Forest is most important vital organ of Earth
  • Tips to play safe Holi
  • Politics of naming candidates
  • Disappearing of spring from season cycle
  • Meira Paibis of Manipur
  • Demand for ST status by Meiteis
  • Project Personal Opening @Assam University
  • World Poetry Day at Manipur University
  • Green skills for sustainable world
  • Supportive interventions during exam time
  • Interesting run up to LS polls
  • Onus definitely on PM to restore peace
  • Nupi Landa Thaunaphabishing #11 :: Book
  • Water, water everywhere ...
  • 21st March - A special day for Forest
  • RI imprisonment to Rapists at Silchar
  • Arrests threaten fragile ceasefire
  • The Valor Within :: Poem
  • Monitoring the rehab centres
  • True colour of politicians
  • North East Film Festival #2 : Gallery
  • Linthoingambi- 'Jury Honourable Mention'
  • Meitei Goddess Phouoibi : An Artwork #3
  • Formation of Wesean Student Federation
  • 20th March- International Day of Happiness
  • A call to first time voter youths
  • Playing the card close to its chest
  • Targeting FOCS and ITLF
  • Students @ Class X Exam : Gallery
  • Alarming Pictures of Nongpok Sekmai River
  • Health camp at Khangabok Relief Camp
  • Absence of refugee laws fuels ethnic tension
  • Electoral bonds and Mr Bond
  • ATSUM spilling the beans now
  • Main stumbling block to peaceful election
  • Descent of Radha-Krishna #26: Download
  • Engudam Kavita: Gold @Bodybuilding Ch'ship
  • Sangai :: An Artwork
  • Deepika M urges to observe 2 Mins Silence
  • Attention Manifesto letters- boxes of promises
  • Gearing up for Lok Sabha polls
  • Debate over long poll process
  • Saroi Khangba @ Kangla : Gallery
  • Stress in adolescents due to ethnic clash
  • Will Manipur ever be the same again
  • Innovation : A review
  • Love and Harmony :: Poem
  • Special scholarship scheme for girls
  • Imphal Book Fair 2023 #3 : Gallery
  • Relief material at Serou & Wangoo
  • The power of the human-animal bond
  • Agribusiness & food processing in North East
  • India Defense Policy: Challenge & Imperative
  • Sit across the table and talk
  • Controversial arrest & chaotic confusion
  • Protest for scrapping SoO #2 :Gallery
  • Kangpokpi, a safe haven for immigrants
  • Maharaj Narasingh Statue @Kangla :Gallery
  • North East Film Festival #1 : Gallery
  • Shopping List for Shivaratri : Gallery
  • N Tombi Equestrian C'ships #1 : Gallery
  • Featured Front Page Photo 2024 #1: Gallery
  • Transgender Malem protest [Mar 6] : Gallery
  • Radio E-pao: Manipuri Film OST (130+ song)
  • Monica Konjengbam- Mega Miss North East
  • Save Manipur : Protest [Feb 15] #3 : Gallery
  • Martin Irengbam - Mister North East 2024
  • Naorem Roshibina- Wushu Medallist : Gallery
  • GHOST of PEACE :: Download Booklet
  • Arambai Tengol & SFs #4 : Gallery
  • Abnormal population growth of Kuki from 1881
  • Resilience in adversity | Kumbi : Gallery
  • Protests attack @ Moreh [18 Jan] #2: Gallery
  • Oinam Chaoba Devi: Sepak Takraw : Gallery
  • List of Kings of Manipur: 33 - 1984 AD