TODAY -

E-Pao! Education - Tipaimukh Dam Is A Geotectonic Blunder Of International Dimensions?

Tipaimukh Dam Is A Geotectonic Blunder Of International Dimensions?
- Part 2 -

By: Dr. Debabrata Roy Laifungbam / Dr. Soibam Ibotombi *



Tipaimukh Dam/Cachar Plain Irrigation Project: A Complicated International Disaster
Scenario for Bangladesh


The scenario and consequences of a Tipaimukh Dam-break has not been thoroughly studied. NEEPCO has yet to complete a basic scientifically sound environment impact assessment even though it is geared up to start construction after having opened international bidding for Engineering, Procurement and Construction (EPC). Such a study has to be conducted by international as well as national dam-safety experts as the impacts of a dam-break will have both severe upstream and downstream effects.

However, the downstream effects of a Tipaimukh Dam-break have been studied by the Government of Bangladesh since 1992-94. In its Flood Action Plan 6 (FAP 6) as part of the North Eastern Regional Water Management Plan of Bangladesh, the scenario of a dam failure at Tipaimukh Dam project was investigated by international hydraulic and environmental experts in the context of a comprehensive flood action plan for Sylhet District.

India is also planning a major Cachar Plain Irrigation Project downstream of the dam. Bangladesh already knew a fact that we in Manipur do not know still. Surprisingly, for the people of Manipur, the Tipaimukh project is not the only project at the drawing board on the Barak River. This means that water released from the dam reservoir will be further diverted for the irrigation project planned in Cachar District, contrary to NEEPCO's recent claims.

FAP 6 had a Future Without Plan (FWO) component that looks at a dam-break scenario with minimally adequate project description available through the Joint Rivers Commission (Indo-Bangladesh). Bangladesh has pending issues with the Government of India with regard to the dam that includes the effects of flow regulation. Regulation of the Barak's flow by Tipaimukh Dam would provide India with the opportunity to irrigate the Cachar Plain; this India proposes to do.

Since the Cachar Plain Irrigation plan involves the loss of water, it is a matter of great concern to Bangladesh particularly its North Eastern Region as no statement is available how much water Indian intends to take from this scheme. For the purposes of the FAP 6 study it was assumed that the total depth of irrigation water to be applied is 1 M and that the water is diverted on a continuous basis during the six dry months (November through April).

A dam-break scenario must be studied by dam safety specialists. It is very doubtful whether NEEPCO or any other agency has conducted such a study. According to the Bangladesh study, the risk that the Tipaimukh Dam poses for Bangladesh is extremely significant for the Meghna River system (including the Surma and Kushiyara Rivers of Sylhet).

The study recognises that the region is known to be vulnerable to earthquakes. These events, though relatively rare are extreme in intensity, and can reverse existing morphologic trends and even induce re-configuration of the drainage system.

The likelihood that during 1991-2015 the region would experience an earthquake of magnitude 7.6 (similar to the 8 July 1918 event with its epicenter at Srimangal of magnitude 7.6, return period of 30 to 50 years) is between 40 and 60%; of magnitude 8.7 (similar to the 12 June 1897 event with its epicenter at the Shillong Plateau with magnitude 8.7, the largest on record, return period of 300 to 1000 years) is perhaps 2 to 5%, assuming the events are random and can be described with a simple binomial probability model.

On past evidence, river channels and sedimentation patterns in the Northeast Region may be subject to major disruptions following a severe seismic event. During past earthquakes, instances of ground liquefaction, landsliding, rapid subsidence, collapse of river banks, and changes to river courses have been documented (District Gazetteer, 1917). The effects of earthquakes along the Brahmaputra River were described in 1899:

"Strong ground shaking triggers liquefaction of river cross-sections in a few seconds; underwater slopes slide towards the stream axis, the bottom of the river heaves, and the banks become lowered; water immediately starts to rise and overflows the banks and adjacent zones where infilling of the channels takes place. Natural sills form, causing temporary lakes to develop; channels gradually re-open by scouring where currents are strong enough, and consequently water levels decrease.

Where channels remain blocked, streams desert their old channels to form new ones; and in subsequent years, the huge amounts of sediment poured into the river as a result of the earthquake gradually moves downstream. Sediment transport is higher than previously and siltation conditions are therefore modified.

Earthquakes are believed to have also induced landsliding and slope failures in headwater catchments in the Shillong Plateau, which could greatly increase the amount of sediment supplied to the region for long periods of time. Joglekar (1971) described apparent impacts of major earthquakes on the upper Brahmaputra in Assam, India. After the severe earthquakes of 1947 and 1950, the bed level near Dibrugarh rose substantially. Between 1947 and 1951, low water levels rose by as much as three to four metres; thereafter they were steady.

Dam Failure

This risk is however a significant issue relating to future environmental management of the Northeast Region water system of Bangladesh.

A dambreak is a catastrophic failure of a dam which results in the sudden draining of the reservoir and a severe flood wave that causes destruction and in many cases death downstream. While such failures are rare and are not planned they have happened to dams, large and small, from time to time. The International Commission on Large Dams (ICOLD) has identified 164 major dam failures in the period from 1900 to 1965.

With respect to the safety of the proposed Tipaimukh Dam, hydraulic and environmental specialists opine that well-designed and constructed rockfill dams are perhaps the safest type for large heights (Tipaimukh would be among the largest of such dams in the world), but local circumstances may be much more important in this respect than dam type.

Two examples illustrate the types of failures that have been reported. The most famous, the Teton Dam in the United States was a 90 m high earth-fill dam which failed in 1.25 hours. The flood wave which was released had a peak discharge of 65,000 m3 s-1 at the dam and a height of 20 m high in the downstream canyon. The Huaccoto Dam in Peru was 170 m high, similar to the Tipaimukh Dam; it failed over 48 hours due to a natural landslide in the reservoir.

Generally, a flood wave travels downstream at a rate in the order of 10 km hr-1 although velocities as high as 30 km hr-1 have been reported near failure sites. From these wave velocities, it would appear that the initial flood wave could travel the 200 km distance from Tipaimukh Dam site to the eastern limit of Bangladesh within 24 hours having a height of perhaps 5 m. Peak flooding would occur some 24 to 48 hours later. High inflows would persist for ten days or longer and the flooded area would likely take several weeks to drain.

The Tipaimukh reservoir is huge (15,000 Mm3) compared with experience reported in the literature. In the event of a significant unplanned discharge, the river system in Bangladesh would respond (drain) rather slowly, as characterized by the outflow rate relative to the floodplain storage volume), such that most of the water released would remain ponded over the Northeast Region for some time. Assuming a release volume of 10 Mm3 and a ponded area of 100 km2, the depth of flooding would be an average of 1.0 m above the normal flood level.

There will be first an imperative need for Bangladesh and India to cooperate in formulating and implementing risk management measures if the Tipaimukh Dam as presently designed should be constructed. A wide range of risk management measures are normally undertaken, including: regular inspections by independent engineering teams, instrumentation and plans for warning downstream populations of deteriorating conditions of a dam, evacuation plans, and so on. As and when India's plans proceed, there will be a clear need for Bangladesh to avail itself of expert technical assistance from dam safety specialists experienced with very large dam/reservoir systems and trans-border risk management.

For illustrative purposes only, the Bangladesh study modeled flood waves for a test case of an instantaneous failure, 50 m wide extending to 100 m below the crest of the dam. Discharge and water level hydrographs were presented for three locations: at the exit from the mountain valley (km 80), at Silchar (in the middle of the Cachar plain, km 140) and at Amalshid (km 200).

It was forecast that substantial attenuation of the flood wave would occur upstream of Amalshid and that the flood wave at Amalshid would be a long-duration event. Depending on the breech geometry and peak discharge, the flood peak would occur at Amalshid approximately 2 to 3 days after the dam break had occurred and flooding would continue for ten days or more. The flood levels at Amalshid would rise to approximately 25 m PWD (peak water discharge), which is at approximately 8 m above the floodplain level. This flood level depends on the boundary assumptions made and could vary depending on floodplain conveyance.

Socio-Economic Aspects: "An Electric Bulb from every Tree"

As per the technical report of the NEEPCO (1998), the dam will have a firm generation of 401.25MW only implying that 401.25MW of power only will be generated regularly, and this is the best scenario. And again as per the past Central Government formula, the Government of Manipur (GOM) will get only 12% of 401.25 i.e. 40-43MW free (sharing with Mizoram where 90% is claimed by Manipur state but this is subject to Government of India set norms which has changed from time to time; it has been revised since).

In order to get this 40-43MW of power, the State will be loosing around 293.56Km2 under submergence of reservoir water which includes 4760ha of gardens, 2053ha of rice cultivable land, 178.21Km2 of total 7251.36Km2 of forest land beside affecting a numbers of villages (15+90). Let us introspect as well as retrospect the case of Tipaimukh dam in comparison with the Loktak Hydro Electric Project and analyze the possible implications in the next 50 years hence especially for the natural resources that will be deprived of the state.

When Loktak project was initiated in the late 1960's - the tall claims made by the authority/government were: thousands of hectares of cultivable land will be generated by draining water of Loktak lake to Leimatak river, price of 1 unit of power will be only 5 paise, the installed capacity of 105MW is 10 times more than the power what the State requires and there will be no power problem for the next 50 years or so, etc.

Now it is over 20 years of commissioning of the project - thousands of cultivable land have been submerged under the lake (reservoir) water contrary to what they claimed, 50-70 paise was price of 1 unit of power at the time of commission, power supply is at its worst nowadays and likely to worsen, which every citizen knows; and rehabilitation and compensation issues are yet to be settled at the Gauhati High Court.

And besides, a range of grave environmental and ecological problems especially of the Loktak Lake threatens this internationally important wetland's very existence along with the Keibul Lamjao National Park, with ecological damage to the entire Imphal Valley and the catchment areas. The State gets about 6-10MW of free power intermittently from the Loktak Hydro Project. The question is whether it is sufficient to compensate the economic, natural resources and environmental loss which the State bears presently?

Now let us examine the possible implications of the Tipaimukh project in a similar manner. As pointed out above, the 293.56Km2 of submerged area consists of 5760ha and 2053ha of garden and cultivable lands respectively. These figures, the author believes, are far underestimated because at present, less than 50% of arable and cultivable lands in the Barak river beds are utilized due to thin population of the region, which will be possibly utilized in the next 50 years due to population increase. So approximately a total of about 15,626ha (11520ha + 4106ha) of cultivable land will be lost.

Again, although 178.21Km2 of the total forest area will be permanently submerged under water, practically the natural resources of a much larger forest area will be unavailable permanently to the State. Net Present Value levy for forest land conversion to non-forestry use as per the Supreme Court directives would also make the project economically unviable, as claimed by NEEPCO on 28t January 2006 (Tipaimukh Multipurpose project tariff increases by 67 paisa/unit on this account of NPV) in its submission to the Supreme Court's Expert Committee.

Compensatory Afforestation Programmes (CAP) will take over large tracts of other categories of forested lands besides Reserve Forests as well, but most of these programmes will never be implemented. After completion of the project, the project authority will claim that depletion of forest and other natural resources in the nearby catchment area will increase siltation in the reservoir leading to the reduction in storage capacity of the reservoir. This, in turn, will reduce the generation capability of the power plant and so on.

The same was true in the case Loktak project where the lake water level is to be maintained as a reservoir in order to generate electricity, submerging thousands of cultivable land contrary to what the authority claimed in the beginning. So the question that can be raised is whether it will be a wise policy, in the long run, to surrender such a huge natural resources just for 40-43MW of free power. This is a huge question, no doubt, to ponder upon.

Discussion and Conclusion

Structural and tectonic setting, plate kinematics and interaction as well as seismic potential of Manipur state and the serious implications for the entire region's existing geomorphologic trends and even induce re-configuration of the drainage system amount to scientific and technical objections to the construction of a huge dam of the magnitude proposed in case of the Tipaimukh dam. Because, such a outmoded design dam may have the potential risk of a great disaster, killing hundreds and thousands of lives, and causing generational incalculable losses to future economic options, livelihoods and cultures.

So, the government must rethink about the construction of such a huge dam. Instead, it is advisable to construct relatively smaller projects with improved modern designs in order to scale down the magnitude of possible disaster since earthquake prediction and prevention is beyond human capability. It would be wiser and economically more sustainable to consider smaller dams or Run-of-the-River (RoR) schemes with an objective to reduce human induced disaster, and save the river.

Construction of smaller projects not only will tone down the magnitude of the possible human induced disaster but also will provide balanced sustainable development avenues for various regions of the State as well as minimize the environmental and ecological instability. In the meantime, Government of Manipur also should reassess all the power projects especially in terms of its operational efficiency and potentiality instead of simply waiting for a mere 40-43MW free power from Tipaimukh project which could last as long as 20-25 years.

For instance, the expected maximum head (difference between reservoir water level and power generation unit) is about 160m in the case of Tipaimukh project while in the case of Loktak Lake the head is about 269m which is approximately 100m more than that of the proposed Tipaimukh project. But such a tremendous head is wasted just to generate a variable 40-80MW of power only. This is nothing but sheer wasting of huge natural resources by severely underutilizing the immense potential. So, the potential of the installed Loktak project should be fully harnessed by Manipur after reassessing and renovating with an objective of enhancing its efficacy and benefit to the State while the project exists.

In conclusion, let us not waste and surrender our huge natural resources just for 40-43MW of power, and let us introspect, learn through mistakes of the past and rectify ourselves than repeating it. Because a wrong decision of ours will cost heavily on our future generation who will, otherwise, never forgive us. Let us remember popular Native American proverb which says, "The frog does not drink up the pond in which he lives."


Dr. Debabrata Roy Laifungbam is the Director, CORE, Manipur. Dr. Soibam Ibotombi is from the Dept. of Earth Sciences, Manipur University. This is their first contribution to e-pao.net . You can contact CORE (Centre for Organisation Research & Education) at http://www.coremanipur.org/


* Comments posted by users in this discussion thread and other parts of this site are opinions of the individuals posting them (whose user ID is displayed alongside) and not the views of e-pao.net. We strongly recommend that users exercise responsibility, sensitivity and caution over language while writing your opinions which will be seen and read by other users. Please read a complete Guideline on using comments on this website.




LATEST IN E-PAO.NET
  • Meiteis must unite for survival
  • Violence in Manipur 2023-2024 : Timeline
  • Flood advisories issued
  • State & District Control Rooms
  • Green Hydrogen for a clean environment
  • Need for an Emergency
  • Monsoons beauty
  • Calling out the indifference of Delhi
  • Questioning the silence with a roar
  • Birth Centenary of Jananeta Irabat, 1996 : #8
  • Problem & prospect of floriculture in Manipur
  • WomenLeaders India Fellowship 2024-25
  • Naga Peace Talks and Narasimha Rao
  • Arunachal Minister visits Oil Palm @Godavari
  • Clear cut stand from the Nagas
  • Crisis resolution in 100-day plan ?
  • Great June Uprising @Kekrupat #2 : Gallery
  • Manipur: A battleground of imperial geopolitics
  • Wangkhem Suresh @ Higher Defence Course
  • Shoppers Stop's 1st Store in Dimapur
  • Stop razing rail station, divert 25k Cr to Signal
  • Has Imphal completely lost the plot ?
  • Time to take responsibility
  • Tarpon chaklen katpa @ Andro #3 : Gallery
  • July Calendar for Year 2024 : Tools
  • Letter to Prime Minister of India
  • International Day of Parliamentarism
  • Skill Development Course at Lumshnong
  • The Power of Poppy - 37 :: Poem
  • Radio E-pao: Manipuri Film OST (130+ song)
  • Manipur Kanba Khongchat #1 : Gallery
  • Multiple Openings @ JCRE Solutions
  • Our mass addiction to predicting future
  • Bonsai - A play with another aspect : Review
  • Timely diagnosis to stop misuse of medicines
  • Impactful tool- Instagram marketing strategy
  • Essence of the June 28 rally
  • Birds of the same feather
  • Scientist of Manipur: Satyendra Thoudam
  • Education and the fate of Manipur
  • Centre not mind talking to Kitovi or Alezo
  • "ST status for Meetei" at Nambol
  • Why Bangladesh urge military diplomacy
  • MoU : Assam Don Bosco Univ with Cambridge
  • Understanding beyond the coup
  • Donning the role of LoP
  • Rally @ Jiribam [June 26] : Gallery
  • Umananda Island- World smallest river island
  • Breaking the impasse
  • Fantasies of a sinister childhood
  • Program: developing women entrepreneurship
  • Microlearning is impacting talent acquisition
  • Looking for the way forward
  • The message
  • Moirangthem Robi - Mr Universe India 2022
  • Parthenium Menace in Indo-Myanmar : Book
  • Respect & recognise domestic worker
  • "ST status for Meetei" at Hiyanglam
  • One test not for India
  • Include tomatoes in your skincare routine
  • Raising ST call a notch or two higher
  • United in grief, but...
  • Panthoibi Phijol Hongba @Mandalay : Gallery
  • Open Letter to Hon'ble CM of Manipur
  • Slavery in the machine world
  • 'Either Rio regime delivers or it fails'
  • No need for NEET or NET
  • Walkathon to promote health at Guwahati
  • Paradox of arming & disarming citizens
  • Meaningless statements
  • Birth Centenary of Jananeta Irabat, 1996 : #7
  • You are king of web, then slave
  • A Groundbreaking HIV Prevention Option
  • Board of Studies at Assam Don Bosco
  • Public Services as a career choice
  • Manipur violence and state
  • Last minute cancellation
  • Descent of Radha-Krishna #36: Download
  • Saraighat Bridge - An Expedition
  • Meeting with MP Dr Bimol Akoijam
  • Manipur: 11 medal (5 gold) @ Natl Taekwondo
  • Socialization and the Two "Meads"
  • The Power of Poppy - 36 :: Poem
  • Scientist of Manipur: Raghumani Ningthoujam
  • Chilli Chicken Delivers a Flavorful Punch
  • International Day of Yoga 2024
  • Antimicrobial Resistance: Top 10 health threat
  • Indo-Naga Talks (From 2012) :: Timeline
  • Taste vs Health
  • Fiasco of UGC-NET, NEET 2024
  • From NEET to NET: It's time to fix NTA
  • Great June Uprising @Kekrupat #1 : Gallery
  • Ema Panthoibi Phijol Hongba at Mandalay
  • Proposed Palm Plantation behind Jiri violence?
  • 'Why Impose War on Us'
  • Why workers most affected by scorching heat?
  • Coup of 2021 not the only push factor
  • Last chance not to fall from grace
  • Ibudhou Cheng Hongba #1 : Gallery
  • Kind attention 'Your Lordship' CJ of India
  • 'Opposition-less Govt in Nagaland is rhetoric'
  • Xorai - Assam's cultural symbol
  • Natural ways to lighten dark underarms
  • Is Delhi doing the right thing ?
  • Set the priorities right
  • Ima Keithel flood- May 30 #3 : Gallery
  • Modi's arduous journey & fate of Naga peace
  • Autism: Why fit in, when you can stand out?
  • Bloodstained Masquerade :: Poem
  • Dharamvir Singh: Forgotten hero of TV
  • What is keeping the clash going on ?
  • Warning of a coming politico-military storm
  • Birth Centenary of Jananeta Irabat, 1996 : #6
  • The Great June 18 Uprising : Timeline
  • The Great June 18 Uprising : Gallery
  • Are we on track to end AIDS by 2030 ?
  • 3 writers from Manipur for Sahitya Akademi
  • Manipur's traffic, parking: A big nuisance
  • Career in elderly care
  • Keeping the folks under a state of confusion
  • Nothing neat about NEET
  • Aid to relief camps @ Jiribam : Gallery
  • Id Festival- 'Id-Ul-Azha' :: Book
  • World Day to Combat Desertification 2024
  • NDPP did not lose LS due to local problem
  • RSS chief says, priority Manipur
  • What if not IIT ?
  • Waiting for a response from the PM
  • The test of leadership failed
  • Descent of Radha-Krishna #35: Download
  • Gastronomy tourism in Manipur : Gallery
  • Triathlon : Manipur bag 6 medals (3 gold)
  • Illegal immigrants/fugitives from Myanmar
  • Eid-ul-Adha: Embracing sacrifice
  • A solution to Meitei-Kuki-Zo conflict
  • The Power of Poppy - 35 :: Poem
  • Scientist of Manipur: R K Brojen Singh
  • Brief sketch on General Balaram Sougaijamba
  • Non-violent for peaceful, mutual co-existence
  • Homeless person ..alcoholism & defeated TB
  • Cancer on rise among young adults
  • Defending, fighting for Idea of Manipur
  • From partiality to complicity
  • Bike Rally - Sekmai to Kangla : Gallery
  • 'Modi must announce finality of Naga pacts'
  • Gliding over Brahmaputra
  • Question leaks cause stress among student
  • Home remedies for prickly heat
  • After IIT, AIIMS it is now IIM
  • Stealing spotlight from Manipur crisis
  • Tarpon chaklen katpa @ Andro #2 : Gallery
  • Strongly condemns violence in Jiribam
  • Lessons from outcome of LS election
  • Tumcho releases "Goodness of God"
  • Right diagnostic for antimicrobial resistance
  • 12th June is World Day against Child Labour
  • Hands of geo-politics ?
  • The row over NEET-2014
  • 2nd Annual Art Exhibition #1 : Gallery
  • Chilli Chicken: Film Spotlighting NE in B'lore
  • Committee of Narcotics Anonymous - Imphal
  • The Power of Meditation
  • Oceans as a career choice
  • Getting more and more audacious
  • A test of leadership
  • Education Fair @Imphal #2 : Gallery
  • Gifting two seats to Cong
  • Voters empowered democracy
  • Postcards from Meghalaya premieres
  • Milk : Essential nutrient for a healthy body
  • Failing in competitive exam not end of world
  • Delhi : A mere spectator
  • Abandoning Jiribam
  • Birth Centenary of Jananeta Irabat, 1996 : #5
  • Ima Keithel flood- May 30 #2 : Gallery
  • Mainstream in Shoes of Alternative
  • Protect the medicines that protect us
  • Lets take action for our land & our future
  • Democracy and independent media
  • Agenda at work to shut Western Gate
  • Keeping Manipur on the boil
  • Descent of Radha-Krishna #34: Download
  • The Enigmatic Journey of 'Laikhutshangbi'
  • Individual and the Social
  • An Ardent Appeal to All Concerns
  • Condemnation of Attack & Govt Inaction
  • The Power of Poppy - 34 :: Poem
  • Scientist of Manipur: Laishram Shanta
  • Alien fishes spotted in Manipur's rivers
  • Training on mushroom at Langthabal
  • Digital avatars or deepfakes ?
  • 7th June is the World Food Safety Day
  • How to prepare for UPSC after 10th ?
  • The Jiri violence
  • Beginning of a new vote culture ?
  • Bimol Akoijam (Cong) wins Inner PC : Gallery
  • BJP, NPF & other NDA pay heavy price
  • Nature is one of greatest blessings of God
  • Plantation drive in Tripura, Assam & Manipur
  • Summer beauty
  • Environment conservation & over-exploitation
  • Is Modi cut out for leading a coalition ?
  • 'Ishanou' Selection @ Cannes #2: Gallery
  • Scholarship for Johnstone Hr Sec students
  • 1st foundation day of Interfaith Forum
  • World Environment Day: Our land, our future
  • Indonesia stronger anti-tobacco measures
  • Navigating a fragile Myanmar: India's policy
  • New breed entering electoral politics
  • The road to formation of new govt
  • International Dance Day #1 : Gallery
  • Birth Centenary of Jananeta Irabat, 1996 : #4
  • Imphal valley districts flooded #3 : Gallery
  • Ima Keithel flood- May 30 #1 : Gallery
  • Imphal valley districts flooded #2 : Gallery
  • Flooded : Sacrifice of Yairipok's Maiden
  • Imphal valley districts flooded #1 : Gallery
  • Beating of the Retreat #2 : Gallery
  • Licypriya meets Italy PM & Pope Francis
  • HSLC (Class X) 2024 : Full Result
  • HSLC 2024 : Important Info & Grading System
  • HSLC 2024 : Pass % : Private Schools
  • HSLC 2024 : Pass % : Aided Schools
  • HSLC 2024 : Pass % : Govt Schools
  • HSLC 2024 : Statistical Abstract
  • HSLC 2024 : Comparative Statement
  • Children Camp @JNMDA Imphal #3 : Gallery
  • Scientist of Manipur: Jayanta Manoharmayum
  • Scientist of Manipur: Amom Ruhikanta
  • Preserving Thang-Ta :: Rare Photos
  • Malemnganbi Laishram : Science Topper
  • Featured Front Page Photo 2024 #2: Gallery
  • Thokchom Sheityajit : Arts Topper
  • Aiena Naorem : Commerce Topper
  • Hr Secondary Exam 2024 : Science Topper
  • HSE 2024 : Subject Pass Percentage
  • HSE 2024 : District Pass Percentage
  • HSE 2024 : Candidates with Highest Marks
  • Hr Secondary Exam 2024: Science Full Result
  • Hr Secondary Exam 2024: Arts Full Result
  • Hr Secondary Exam 2024: Commerce Result
  • Hr Secondary Exam 2024 : Arts Topper
  • Hr Secondary Exam 2024 : Commerce Topper
  • Aftermath of ferocious hailstorm #1 : Gallery
  • Nupi Landa Thaunaphabishing : Full Book
  • A ferocious hailstorm @Imphal : Gallery
  • '365 Days of Chin-Kuki Aggression' : Gallery
  • Scientists of Manipur : Ngangkham Nimai
  • GHOST of PEACE :: Download Booklet
  • List of Kings of Manipur: 33 - 1984 AD