TODAY -

Comments on Dr. Nargis Banu's Paper
and
Advantages and Disadvantages of Tipaimukh Dam
- Part 1

Bijon B. Sarma *



PREAMBLE :

When we write in websites normally we do not write with utmost seriousness, and we know the reason. Even though lapses/problems in languages are acceptable, in the articles on serious science-based subjects, ideas and thoughts by all means should be specific and expression of intelligence. I did not have any intention to review Environmental Geologist (Kansas, USA) Mr. Meer Husain's article 'CONSTRUCTION OF TIPAIMUKH DAM - A THREAT TO THE NATIONAL INTEREST OF BANGLADESH'.

I did it because he requested me to go through that. Accordingly I did and published my submission. However, the time I went through his paper I was really shocked to see that a person with such expertise uses 'a high-school student's essay' collected from source like 'wikianswer.com' in his paper.

Then I felt tempted to review Dr Nargis Banu's article 'PROTECT PEOPLE AND NATURE FROM TIPAIMUKH DAM', posted by the Bangladesh Expatriate Council. Dr. Hasina Banu is an environmental scientist working with Sydney Water Corporation, Australia. It was mentioned that the paper was presented at a seminar at the Australian National University on July 3, 2009.

By disclosing this information the writer has given us a scope to know what type of papers are presented in such seminars. This author has experiences of such presentations at home and abroad, including Australia.

COMMENTS OF PAPER BY DR. NARGIS BANU

01. DR. NARGIS BANU SAYS : At the beginning (probably Introduction, where Abstract is missing) Dr. Nargis Banu narrated the background story of Tipaimukh project. Here she mentioned two notable issues:
(Quoted). (a) With the construction of Tipaimukh Dam, India would be diverting the Barak's water flow from its north to its south and east. it will have adverse impacts on nature and livelihood in the north-eastern districts in Bangladesh.
(b) Now India has started another intervention on the international river barak at Tipaimukh and will construct a dam at fulertal (100 kilometres downstream from tipaimukh) by 2012.

MY SUBMISSION : The truth is, India initiated construction of a barrage at Fulertal (adjacent to Bangladesh border) long ago and the same has now been abandoned. Now India has proposed for the construction of a dam for the production of hydroelectricity at Tipaimukh, a place located at a distance of over 150 kilometres. Dam and Barrage are two different things. Where as withdrawal of water is the essential objective of barrage, a dam may or may not have such provision.

India has already assured that there will be no withdrawal of water. In such a situation a comment like 'with the construction of Tipaimukh Dam, India would be diverting the barak's water flow from its north to its south and east' is misleading. And if this statement is wrong, the comment based on it and expressed in the following line i.e. (quoted) 'It will have adverse impacts on nature and livelihood in the north-eastern districts in bangladesh' is also wrong.

Those who are aware of the topography, soil condition and climate of Monipur region might know that this region does not really need such diversion of water for irrigation. Let me briefly explain the reason. There may be two prominent reasons of depositing water in the mountains or hills.

(a) In the high rocky mountains water is deposited in cavities and on the picks as ice during the winter. In the summer season those melt and flow down.
(b) The earth-made hills and mounds get wet during rains and release that water as spring or fall, resulting in small canals (local name 'Chhara'). Depending of the size of the mounds, this water may flow throughout the year. While the main source of water in Barak river is the first type, that locally used in Monipur region belongs to the second type.

02. DR. NARGIS BANU SAYS : The author has given some information to prove that there is probability of severe earthquakes in this region.

MY SUBMISSION : It is an established fact that
(a) Monipur-Assam-Sylhet zone is highly earthquake prone,
(b) Large deposit of water at heights intensifies vibration during earth-quake and
(c) Breaking of dam during such hazard would cause havoc. It is obvious that when such a site is found economically feasible and ecologically superior (in comparison with other means of generation of electricity) for a hydro-electric project, the engineers would go for the construction of a safe dam, even if it is costly.

In case of breakage of this dam the most affected country will be India due to the following two major reasons :
(a) Failure of an extremely expensive project and
(b) Catastrophic flooding in the 150 kilometre-stretched land within India.

03. DR. NARGIS BANU SAYS : The author mentioned (quoted) 'the expert appraisal committee of india revealed that the design of the dam contains many errors, and omissions, and falls short of compliance of standards set by the scientific and academic community in india and the world'.

MY SUBMISSION : The fact is, the design of Tipaimukh dam has not been finalized. No one should wonder about such comments by various corners (like, expert appraisal committee) during the preliminary stage of its preparation.

04. DR. NARGIS BANU SAYS : (quoted) 'India conducted detailed studies, completed the final design and environment impact assessment without consultation with bangladesh as a downstream stakeholder'.

MY SUBMISSION : The statement like 'completed the final design' is definitely untrue.

05. DR. NARGIS BANU SAYS : (quoted) 'Indian Government has not clearly stated the amounts of water that will be stopped or diverted with the construction of the tipaimukh dam'.

MY SUBMISSION : The author's statement is not only untrue, but also misleading because the Indian government has stated that it would not divert any water.

06. DR. NARGIS BANU SAYS : (quoted) 'the erosion just downstream of the tipaimukh dam would be excessively high and this erosion would continue as long as hundred kilometres downstream or more in the surma-kushiara system'.

MY SUBMISSION : This statement is wrong. As a matter of fact, after a dam is constructed, the erosion in the down stream is reduced. Let me explain the reason in brief. Soil erosion among other factors depends upon on the velocity of water. The velocity depends among others on two principal factors :
(a) Quantity of water and
(b) Inclination (also known as gradient) of flow-path. After the construction of the dam, the flow of water will be less in the lower region during monsoon months (because the dam would reserve additional water) and the same would increase a little during lean period.

In fact the flow would never attain the highest level that it had before the construction of the dam. As we mentioned, the flow also depends upon inclination of flow-path. A dam constructed on a river considerably reduces this inclination. The dam in fact utilizes the potential energy (in this case energy stored in water due to gravitational force) of the water in the reservoir. After the water starts its fresh journey from a considerably lower level, it loses degree of inclination. Naturally it loses velocity and eroding capability.

07. DR. NARGIS BANU SAYS : (quoted) 'the ... deposition .... will raise the overall bed level of the rivers'. About the affects of silting she commented (01) '... an extreme case it would block the mouth of certain tributaries, and (02) 'will induce the average monsoon flood to become moderate to severe flood in the surma-kushiara floodplain'.

MY SUBMISSION : All these are against the natural rule of science. The fact is, the water carried by the river after the dam would create less siltation because
(i) It would erode less due to the reduced velocity of water and (ii) The dam would arrest the entire sedimentation particles coming from above.

08. DR. NARGIS BANU SAYS : (quoted) 'about 71 per cent of the upper surma-kushiara basin area would no longer be flooded. ... the kushiara-bardal haor .... would become completely dry. the kawardighi haor .... lose around 2,979 ha (26 per cent).'.

MY SUBMISSION : If it really happens like it, then the people of this area would think them fortunate to become free from flood hazard and to get new land.

09. DR. NARGIS BANU SAYS : (quoted) ' ... kushiara would cut its connection with its right bank floodplain ...... and this part will become 'reservoir river' rather than a most valuable 'floodplain river' (prophesy).

MY SUBMISSION : If this prophesy is based on the author's hypothesis of 'increased siltation', then I have explained why it would not take place. However, those who have knowledge of soil structure, inconsistency of river flow etc. of Bangladesh can guess that the new situation might help in straightening the snaking and winding courses of some rivers, thus generating a number of ox-bow lakes. This should be taken as a positive contribution because the more land the rivers would release the better it would be for the country.

10. DR. NARGIS BANU SAYS : (quoted) 'millions of people are dependent on ... barak for agricultural activities. the dam would cause the surma and kushiara to run dry from november to may'.

MY SUBMISSION : This is a wrong statement. The fact is, release of submerged land due to lower level of water in the rainy season and straightening of rivers may release more land, such that more people may be engaged in agriculture. Before making such a statement the author should have studied the basic principle on which a dam for hydraulic project works. Let me explain briefly.

In hydro-electric project the available height of water in the reservoir above the exit-hole is of extreme importance. For the running of the generators water has to be constantly released from the reservoir. The quantity of power generated is proportional to the height of water in the reservoir.

With normal discharge let the height of water during the rainy season is (all arbitrary numbers) say, 100 Feet and that in the lean period (i.e. winter) say, 50 Feet. For optimum production and economic feasibility the designers would have to arrange generators to run by a height in between these two figures (not necessarily the average). Let us say this number is 60 Feet.

In this case the generators would not be able to run at full swing unless during winter nonths unless there is arrangement for storing additional water in the reservoir. This indicates, what the Tipai-authority would do for the smooth-running of their plant throughout the year is, storing extra water during the peak period and releasing the same during lean period. This is exactly what the experts employed by Khaleda Zia's BNP government opined, and to which any scientist or expert would have to agree.

N.B. STRAIGHTENING OF RIVER : It should be noted here that human interference is essential for initial straightening of river. In the country with soft soil, intermittent flow acts against straightening. Once the rivers are cut straight and constant flow is ensured, river may continue to flow in straight line. Such a program can release huge land on both sides.

to be continued.....




* Bijon B. Sarma, (Professor (on LPR), Khulna University, Khulna. Bangladesh) contributes to e-pao.net regularly. The writer can be contacted at rangada(at)gmail(dot)com
This article was webcasted on September 02nd, 2009.




* Comments posted by users in this discussion thread and other parts of this site are opinions of the individuals posting them (whose user ID is displayed alongside) and not the views of e-pao.net. We strongly recommend that users exercise responsibility, sensitivity and caution over language while writing your opinions which will be seen and read by other users. Please read a complete Guideline on using comments on this website.




LATEST IN E-PAO.NET
  • Meiteis must unite for survival
  • Violence in Manipur 2023-2024 : Timeline
  • Flood advisories issued
  • State & District Control Rooms
  • Green Hydrogen for a clean environment
  • Need for an Emergency
  • Monsoons beauty
  • Calling out the indifference of Delhi
  • Questioning the silence with a roar
  • Birth Centenary of Jananeta Irabat, 1996 : #8
  • Problem & prospect of floriculture in Manipur
  • WomenLeaders India Fellowship 2024-25
  • Naga Peace Talks and Narasimha Rao
  • Arunachal Minister visits Oil Palm @Godavari
  • Clear cut stand from the Nagas
  • Crisis resolution in 100-day plan ?
  • Great June Uprising @Kekrupat #2 : Gallery
  • Manipur: A battleground of imperial geopolitics
  • Wangkhem Suresh @ Higher Defence Course
  • Shoppers Stop's 1st Store in Dimapur
  • Stop razing rail station, divert 25k Cr to Signal
  • Has Imphal completely lost the plot ?
  • Time to take responsibility
  • Tarpon chaklen katpa @ Andro #3 : Gallery
  • July Calendar for Year 2024 : Tools
  • Letter to Prime Minister of India
  • International Day of Parliamentarism
  • Skill Development Course at Lumshnong
  • The Power of Poppy - 37 :: Poem
  • Radio E-pao: Manipuri Film OST (130+ song)
  • Manipur Kanba Khongchat #1 : Gallery
  • Multiple Openings @ JCRE Solutions
  • Our mass addiction to predicting future
  • Bonsai - A play with another aspect : Review
  • Timely diagnosis to stop misuse of medicines
  • Impactful tool- Instagram marketing strategy
  • Essence of the June 28 rally
  • Birds of the same feather
  • Scientist of Manipur: Satyendra Thoudam
  • Education and the fate of Manipur
  • Centre not mind talking to Kitovi or Alezo
  • "ST status for Meetei" at Nambol
  • Why Bangladesh urge military diplomacy
  • MoU : Assam Don Bosco Univ with Cambridge
  • Understanding beyond the coup
  • Donning the role of LoP
  • Rally @ Jiribam [June 26] : Gallery
  • Umananda Island- World smallest river island
  • Breaking the impasse
  • Fantasies of a sinister childhood
  • Program: developing women entrepreneurship
  • Microlearning is impacting talent acquisition
  • Looking for the way forward
  • The message
  • Moirangthem Robi - Mr Universe India 2022
  • Parthenium Menace in Indo-Myanmar : Book
  • Respect & recognise domestic worker
  • "ST status for Meetei" at Hiyanglam
  • One test not for India
  • Include tomatoes in your skincare routine
  • Raising ST call a notch or two higher
  • United in grief, but...
  • Panthoibi Phijol Hongba @Mandalay : Gallery
  • Open Letter to Hon'ble CM of Manipur
  • Slavery in the machine world
  • 'Either Rio regime delivers or it fails'
  • No need for NEET or NET
  • Walkathon to promote health at Guwahati
  • Paradox of arming & disarming citizens
  • Meaningless statements
  • Birth Centenary of Jananeta Irabat, 1996 : #7
  • You are king of web, then slave
  • A Groundbreaking HIV Prevention Option
  • Board of Studies at Assam Don Bosco
  • Public Services as a career choice
  • Manipur violence and state
  • Last minute cancellation
  • Descent of Radha-Krishna #36: Download
  • Saraighat Bridge - An Expedition
  • Meeting with MP Dr Bimol Akoijam
  • Manipur: 11 medal (5 gold) @ Natl Taekwondo
  • Socialization and the Two "Meads"
  • The Power of Poppy - 36 :: Poem
  • Scientist of Manipur: Raghumani Ningthoujam
  • Chilli Chicken Delivers a Flavorful Punch
  • International Day of Yoga 2024
  • Antimicrobial Resistance: Top 10 health threat
  • Indo-Naga Talks (From 2012) :: Timeline
  • Taste vs Health
  • Fiasco of UGC-NET, NEET 2024
  • From NEET to NET: It's time to fix NTA
  • Great June Uprising @Kekrupat #1 : Gallery
  • Ema Panthoibi Phijol Hongba at Mandalay
  • Proposed Palm Plantation behind Jiri violence?
  • 'Why Impose War on Us'
  • Why workers most affected by scorching heat?
  • Coup of 2021 not the only push factor
  • Last chance not to fall from grace
  • Ibudhou Cheng Hongba #1 : Gallery
  • Kind attention 'Your Lordship' CJ of India
  • 'Opposition-less Govt in Nagaland is rhetoric'
  • Xorai - Assam's cultural symbol
  • Natural ways to lighten dark underarms
  • Is Delhi doing the right thing ?
  • Set the priorities right
  • Ima Keithel flood- May 30 #3 : Gallery
  • Modi's arduous journey & fate of Naga peace
  • Autism: Why fit in, when you can stand out?
  • Bloodstained Masquerade :: Poem
  • Dharamvir Singh: Forgotten hero of TV
  • What is keeping the clash going on ?
  • Warning of a coming politico-military storm
  • Birth Centenary of Jananeta Irabat, 1996 : #6
  • The Great June 18 Uprising : Timeline
  • The Great June 18 Uprising : Gallery
  • Are we on track to end AIDS by 2030 ?
  • 3 writers from Manipur for Sahitya Akademi
  • Manipur's traffic, parking: A big nuisance
  • Career in elderly care
  • Keeping the folks under a state of confusion
  • Nothing neat about NEET
  • Aid to relief camps @ Jiribam : Gallery
  • Id Festival- 'Id-Ul-Azha' :: Book
  • World Day to Combat Desertification 2024
  • NDPP did not lose LS due to local problem
  • RSS chief says, priority Manipur
  • What if not IIT ?
  • Waiting for a response from the PM
  • The test of leadership failed
  • Descent of Radha-Krishna #35: Download
  • Gastronomy tourism in Manipur : Gallery
  • Triathlon : Manipur bag 6 medals (3 gold)
  • Illegal immigrants/fugitives from Myanmar
  • Eid-ul-Adha: Embracing sacrifice
  • A solution to Meitei-Kuki-Zo conflict
  • The Power of Poppy - 35 :: Poem
  • Scientist of Manipur: R K Brojen Singh
  • Brief sketch on General Balaram Sougaijamba
  • Non-violent for peaceful, mutual co-existence
  • Homeless person ..alcoholism & defeated TB
  • Cancer on rise among young adults
  • Defending, fighting for Idea of Manipur
  • From partiality to complicity
  • Bike Rally - Sekmai to Kangla : Gallery
  • 'Modi must announce finality of Naga pacts'
  • Gliding over Brahmaputra
  • Question leaks cause stress among student
  • Home remedies for prickly heat
  • After IIT, AIIMS it is now IIM
  • Stealing spotlight from Manipur crisis
  • Tarpon chaklen katpa @ Andro #2 : Gallery
  • Strongly condemns violence in Jiribam
  • Lessons from outcome of LS election
  • Tumcho releases "Goodness of God"
  • Right diagnostic for antimicrobial resistance
  • 12th June is World Day against Child Labour
  • Hands of geo-politics ?
  • The row over NEET-2014
  • 2nd Annual Art Exhibition #1 : Gallery
  • Chilli Chicken: Film Spotlighting NE in B'lore
  • Committee of Narcotics Anonymous - Imphal
  • The Power of Meditation
  • Oceans as a career choice
  • Getting more and more audacious
  • A test of leadership
  • Education Fair @Imphal #2 : Gallery
  • Gifting two seats to Cong
  • Voters empowered democracy
  • Postcards from Meghalaya premieres
  • Milk : Essential nutrient for a healthy body
  • Failing in competitive exam not end of world
  • Delhi : A mere spectator
  • Abandoning Jiribam
  • Birth Centenary of Jananeta Irabat, 1996 : #5
  • Ima Keithel flood- May 30 #2 : Gallery
  • Mainstream in Shoes of Alternative
  • Protect the medicines that protect us
  • Lets take action for our land & our future
  • Democracy and independent media
  • Agenda at work to shut Western Gate
  • Keeping Manipur on the boil
  • Descent of Radha-Krishna #34: Download
  • The Enigmatic Journey of 'Laikhutshangbi'
  • Individual and the Social
  • An Ardent Appeal to All Concerns
  • Condemnation of Attack & Govt Inaction
  • The Power of Poppy - 34 :: Poem
  • Scientist of Manipur: Laishram Shanta
  • Alien fishes spotted in Manipur's rivers
  • Training on mushroom at Langthabal
  • Digital avatars or deepfakes ?
  • 7th June is the World Food Safety Day
  • How to prepare for UPSC after 10th ?
  • The Jiri violence
  • Beginning of a new vote culture ?
  • Bimol Akoijam (Cong) wins Inner PC : Gallery
  • BJP, NPF & other NDA pay heavy price
  • Nature is one of greatest blessings of God
  • Plantation drive in Tripura, Assam & Manipur
  • Summer beauty
  • Environment conservation & over-exploitation
  • Is Modi cut out for leading a coalition ?
  • 'Ishanou' Selection @ Cannes #2: Gallery
  • Scholarship for Johnstone Hr Sec students
  • 1st foundation day of Interfaith Forum
  • World Environment Day: Our land, our future
  • Indonesia stronger anti-tobacco measures
  • Navigating a fragile Myanmar: India's policy
  • New breed entering electoral politics
  • The road to formation of new govt
  • International Dance Day #1 : Gallery
  • Birth Centenary of Jananeta Irabat, 1996 : #4
  • Imphal valley districts flooded #3 : Gallery
  • Ima Keithel flood- May 30 #1 : Gallery
  • Imphal valley districts flooded #2 : Gallery
  • Flooded : Sacrifice of Yairipok's Maiden
  • Imphal valley districts flooded #1 : Gallery
  • Beating of the Retreat #2 : Gallery
  • Licypriya meets Italy PM & Pope Francis
  • HSLC (Class X) 2024 : Full Result
  • HSLC 2024 : Important Info & Grading System
  • HSLC 2024 : Pass % : Private Schools
  • HSLC 2024 : Pass % : Aided Schools
  • HSLC 2024 : Pass % : Govt Schools
  • HSLC 2024 : Statistical Abstract
  • HSLC 2024 : Comparative Statement
  • Children Camp @JNMDA Imphal #3 : Gallery
  • Scientist of Manipur: Jayanta Manoharmayum
  • Scientist of Manipur: Amom Ruhikanta
  • Preserving Thang-Ta :: Rare Photos
  • Malemnganbi Laishram : Science Topper
  • Featured Front Page Photo 2024 #2: Gallery
  • Thokchom Sheityajit : Arts Topper
  • Aiena Naorem : Commerce Topper
  • Hr Secondary Exam 2024 : Science Topper
  • HSE 2024 : Subject Pass Percentage
  • HSE 2024 : District Pass Percentage
  • HSE 2024 : Candidates with Highest Marks
  • Hr Secondary Exam 2024: Science Full Result
  • Hr Secondary Exam 2024: Arts Full Result
  • Hr Secondary Exam 2024: Commerce Result
  • Hr Secondary Exam 2024 : Arts Topper
  • Hr Secondary Exam 2024 : Commerce Topper
  • Aftermath of ferocious hailstorm #1 : Gallery
  • Nupi Landa Thaunaphabishing : Full Book
  • A ferocious hailstorm @Imphal : Gallery
  • '365 Days of Chin-Kuki Aggression' : Gallery
  • Scientists of Manipur : Ngangkham Nimai
  • GHOST of PEACE :: Download Booklet
  • List of Kings of Manipur: 33 - 1984 AD