Bandh concludes peacefully
Source: The Sangai Express
Imphal, October 23 2013:
The 12-hour total bandh called by the JAC constituted in connection with missing of earth excavator driver Meisnam Devaraj along Imphal-Ukhrul, Imphal-Saikul and Tinsid roads ended peacefully.
Supported by different organisations, JAC members clamped bandh at Lamlong bazar and blocked road at Khurai Konsam Leikai and Chaithabi Leirak on Imphal-Ukhrul road and Salanthong and Heikrumakhong on Imphal-Saikul road using tree branches and bamboos.
No vehicle except emergency cases and services was allowed to ply along these roads.
The JAC said that more intense forms of agitation would be staged if Devaraj's whereabouts is not traced within three days.